Filming permissions in India are not a single approval. Which application applies depends on who is applying, what is being made and where it will be filmed. A permission for the project may still leave individual locations, specialist activities and travelling crew to separate authorities. This guide sets out how to identify the route, prepare the information and keep track of what has and has not been approved.

Official guidance was checked on 14 November 2026. Requirements, fees and application arrangements can change. Confirm the applicable instructions with the relevant authority before submitting an application.

Identify the Filming Permission Route

India Cine Hub, run from the NFDC office in Mumbai, describes itself as the single-window facilitation point for feature films, TV and web shows and series, and reality shows. For foreign productions the permission itself is granted by the Ministry of Information and Broadcasting. Its pages state that documentaries, audio-visual commercials and music videos are not accepted through that route.

Start by placing the project in one of these groups:

  • Foreign feature, series or reality production. The foreign filmmaker or production company applies through India Cine Hub. The international projects guide describes registration, an online form, supporting documents and a non-refundable processing fee stated as the INR equivalent of USD 225.
  • Foreign documentary or commercial. The Ministry of External Affairs describes a separate route in which the foreign agency applies to the Press and Information office at the relevant Indian Embassy or High Commission. See the Ministry of External Affairs documentary guidance. It states no processing time, and the MEA guidance refers to a Journalist (‘J’) visa for approved documentary filming. India Cine Hub’s FAQ also directs foreign audiovisual agencies making music videos to the Ministry of External Affairs. Confirm the applicable submission and visa requirements with the relevant Indian mission.
  • Domestic project. The domestic projects guide says applying through India Cine Hub is not mandatory. A domestic filmmaker may apply there, where applications are routed to the relevant State Nodal officer, or approach states and central ministries directly.
  • Official co-production. India Cine Hub directs official treaty co-productions to the international route and asks for the co-production agreement.

For the foreign-production routes described above, the applicable visa instructions link the application to project approval. India Cine Hub states that the Film Visa can be applied for after shooting permission is granted, and that cast and crew must be employed by the foreign company that sought the permission. Its film visa guidance also covers when registration with the Foreigners Regional Registration Office applies. Production incentives are a separate process and do not substitute for filming permission.

Separate Project Permission from Location Approvals

The Ministry letter is not a blanket authority to film anywhere. India Cine Hub states that its letter facilitates permissions from local authorities but does not grant them, that some authorities may require direct applications, and that permits are issued for specific dates and locations. For the international route described by India Cine Hub, applicants can submit location-permit requests through the dashboard after receiving project permission. Other routes should follow their own application instructions.

Project Permission and Location Checks in IndiaProject permissionGranted for the project on the route that appliesLocation and activity checks, as the project requiresProperty or site ownerHeritage and protected sitesForests, railways, airportsAerial, animals, other activitiesRecorded approvals and conditionsStatus, conditions and amendments
Project permission does not replace location-specific or specialist approvals.

In practice a production keeps two lists. The first records the project-level decision: who granted it, for which title, script and crew, and what it covers. The second records each location, its controlling authority or owner, the dates sought and the status of each request. A permission for the project does not authorise a particular property, monument, railway location, forest or airport on its own.

India Cine Hub lists nodal officers for states and union territories and for central bodies, and the application dashboard routes location requests to the relevant state or union territory. India Cine Hub states that location fees are paid to the state concerned and do not form part of the processing fee, so confirm the amount with the local authority.

Prepare Supporting Information and Documents

Several routes request overlapping information, but each has its own checklist. The India Cine Hub international projects guide lists the following for foreign projects, and the domestic projects guide asks for a similar set with location-wise detail:

  • A detailed script and synopsis, or a detailed concept for a reality show.
  • Crew passport details in tabular form, with copies, for foreign applications.
  • Shooting locations and the shooting period.
  • A list of equipment to be temporarily imported.
  • India Cine Hub recommends a No Objection Letter where a living person is portrayed, and suggests sharing the script with that person or their legal heirs.
  • The co-production agreement, where the project is an official co-production.

For domestic applications India Cine Hub also asks for location-wise cast, crew and equipment, and for location-wise additional requirements such as animals, arms, crowds, set structures, vehicles and special effects. Those are the items most likely to need a decision from a local authority, so list them early.

This is general preparation, not a substitute for an authority’s own checklist. Railways, forests, aerial filming, monuments and the Ministry of External Affairs route each name their own forms, officers or conditions. Gather the common documents once, then add what each authority asks for.

India Cine Hub states that permission normally takes no more than three weeks after all documents are submitted, with longer consultation where the Ministry of Home Affairs or the Ministry of External Affairs is involved. For non-restricted areas it advises applying around 30 days ahead. These are stated processing expectations, not guaranteed outcomes.

Download the India filming permissions planning and decision tracker to record application routes, location approvals, conditions and amendments. This printable worksheet is not an official application form or permission to film.

Check Specialist Locations Early

Some locations carry their own authority and requirements. The summaries below only flag where to look, because each official page sets its own procedure, fees and conditions.

  • Protected monuments. The Archaeological Survey of India grants permission for its forts and monuments, and India Cine Hub states that applications for them go through its portal. See the monuments guidance. Monuments protected by a state are not covered on that page.
  • Railways. The railways guidance names the Executive Director (Information & Publicity), Railway Board, for foreign nationals and the Chief Public Relations Officer of the concerned Zonal Railway for Indian nationals.
  • Forests and protected wildlife areas. The forests guidance identifies the Wildlife Division of the Ministry of Environment, Forest and Climate Change and provides an application form for filming in forest and wildlife areas.
  • Airports and aerial filming. India Cine Hub’s aerial filming guidance identifies separate application channels for airport ground photography and drone filming. Check the applicable aviation requirements and any airport, security or location permissions for the proposed activity.
  • Animals. The animals guidance refers to the Animal Welfare Board of India and links its rules and notifications.

India Cine Hub does not publish a page for every location type, and it notes that some protected and restricted areas take longer or may not be approved. Where no official page is available, ask the controlling authority or property owner directly. Do not assume the process for one site applies to another.

Track Conditions, Amendments and Outstanding Decisions

Submitting an application is not an approval. Keep a record that separates each request into submitted, approved with conditions, approved without conditions, declined and awaiting a response. Note the date and the person at the authority who confirmed it.

Changes need handling according to the route. On the international route, India Cine Hub states that the title, script, synopsis and deceased-personality status cannot be modified without its approval, and that material deviations during filming need Ministry permission through India Cine Hub before those scenes are shot. A change of co-production company means notifying India Cine Hub and applying afresh. On the domestic route, it states that once an application has been sent to a state, changes are made directly with the State Nodal officer.

Read conditions as part of the permission. The official pages mention liaison officers attached to a shoot, the possibility that a finished film may need to be shown to a government representative before release, and a compulsory feedback form after filming. Record who is responsible for each condition and when it falls due. Where a date, crew member or activity changes, check which authority needs to be told before the change takes effect.

Appoint Coordination Support

The appointment identifies who prepares applications, follows up requests, records conditions and approves related expenditure. Budget and schedule management, local coordination and application responsibilities may be assigned separately.

A film fixer in India can coordinate agreed access enquiries, application follow-up and local arrangements. A line producer in India can incorporate permission-related costs and scheduling dependencies into the production plan. Responsibilities are defined in the appointment; approval remains with the relevant authority or site owner.

Back to top: